环球UGwww.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博官网www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。 Allbet声明:该文看法仅代表作者自己,与本平台无关。转载请注明:欧博官网(www.aLLbet8.vip):Fukushima debris removal delayed by another year
发布评论

分享到:

三公大吃小棋牌游戏:2,636 new Covid cases, 11 deaths
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。